Complete A3 problem solving from 6W problem description to 6M-Ishikawa, 5-Why, immediate actions, through to sustainable verification and form sheet export.
A3 AI Tool
Public example · read-only
41 %
Problem solving sheet
Team lead: Markus Weber
Team members: Sarah Fischer, Thomas Schulz, Elena Kostic
Team members: Sarah Fischer, Thomas Schulz, Elena Kostic
Facts / team building
ProblemEdge fracture on the sides of the Milka Alpine Milk 100g bar after the wrapping process
PlantLörrach Plant 1
Area/workstationPackaging line 4
Product/componentMilka Alpine Milk 100g
Number of defectsSystematic edge chamfering on the panel sides
Date discoveredFinal inspection after winder
Discovered byQuality Assurance Employee
Recurrence ja× no

Fehlerklassifizierung
Nicht ausgewählt
Problem description
| Description | The problem is (NOK product/process) | The problem is not (Comparison with an OK product/process) |
|---|---|---|
| What exactly is the problem? | Edge fracture on the sides of the Milka Alpine Milk 100g bar | Complete breakage of the panel or damage to the surface embossing |
| Wo does the problem occur? | Packaging line 4 after the winder | Other packaging lines in the plant or chocolate production |
| How is the problem evident? | Systematic edge chamfering for 100g bars during the packaging process | Isolated, random scratches or errors due to manual handling |
| Wann does the problem occur? | Detected during final inspection on the current production day | In past shifts or after storage in the central warehouse |
| Why is it a problem? | Deviation of product condition from quality standards for Milka Alpenmilch 100g | Planned process changes or regular wear of packaging materials |
Containment actions
| Nr. | Action | Responsibility | Deadline | Status |
|---|---|---|---|---|
| 1 | Sofortige 100%-Sichtprüfung aller verpackten Einheiten der aktuellen Charge am Ausgang der Linie 4 | Sarah Fischer | 15.10.26 | ● |
| 2 | Überprüfung der Wicklereinstellungen und Justierung der Greiferführung zur Druckentlastung | Thomas Schulz | 15.10.26 | ● |
| 3 | Durchführung eines kontrollierten Testlaufs über 500 Einheiten zur Verifikation der Kantenintegrität | Elena Kostic | 16.10.26 | ● |
Root cause analysis (Ishikawa)
Human
- Loading process during manual format readjustment without torque gauge
- Training record for winder adjustment not documented consistently
Machine
- Guide rails at the winder inlet narrowed by 1.8 mm (mechanical pressure)
- Pneumatic pressure at the folding punch fluctuates between 4.2 and 5.8 bar
Material
- Tabling / cocoa butter structure within standard range, no brittleness anomaly
- Packaging film thickness corresponds to the specification (45 µm)
- Cycle speed increased from 120 to 145 cycles/min after shift change without format adjustment
Method
- Cooling tunnel exit temperature fluctuated by 3 °C before winder
Environment
- Inspection interval at final inspection was 60 min instead of 15 min after startup
Measurement
Problem:
Edge fracture on the sides of the Milka Alpine Milk 100g bar after the wrapping process
Probable causeTo be reviewedNicht priorisiert / ausgeschlossen
Root cause analysis (5-Why)
| Root cause 1 Guide rails at the inlet narrowed and cycle rate increased |
|---|
| 1. Warum?Why are the panel edges breaking? Because the folding punch is pressing on the panel edge with too much force. |
| 2. Warum?Why is the punch pressing too hard? Because the guide rail was narrowed and the panel was not lying flat in the nest. |
| 3. Warum?Why was the guide rail narrowed? Because it was fastened without a setting gauge after the last setup process. |
| 4. Warum?Why was it fastened without a setting gauge? Because the fixed setting gauge was missing from the setup trolley. |
| 5. Warum?Why was the setting gauge missing? Because no tool checklist was stored in the setup standard (SOP) (root cause). |
| Grundursache:Missing Poka Yoke setup gauge and incomplete setup SOP for guide rails. |
Actions to eliminate the identified root cause(s)
| Nr. | Action | Responsibility | Deadline | Status |
|---|---|---|---|---|
| 1 | Poka-Yoke Einstelllehre für Führungsschiene Linie 4 beschaffen und fest an der Maschine montieren | Thomas Schulz (Instandhaltung) | 20.10.26 | ◐ |
| 2 | Druckminderer mit digitaler Verriegelung (4,5 ± 0,2 bar) am Faltstempel installieren | K. Weber | 22.10.26 | ◐ |
| 3 | Rüst-SOP VA-VERP-04 überarbeiten: Pflichtprüfung Führungsschienen-Spaltmaß mit Go/NoGo-Lehre | Sarah Fischer (QM) | 25.10.26 | ○ |
| 4 | Schulung aller Maschinenbediener und Schichtleiter auf die neue Rüst-Checkliste | Markus Weber | 28.10.26 | ○ |
Effectiveness evidence (testing, trials, KPI monitoring)
| Nr. | Action | Responsibility | Deadline | Status |
|---|---|---|---|---|
| 1 | 0 % Kantenbruch bei 100.000 produzierten Einheiten über 14 Produktionstage (Cpk > 1,67) | Sarah Fischer | 15.11.26 | ○ |
| 2 | Tägliches Rüst-Audit durch Schichtleiter über 4 Wochen dokumentiert | Thomas Schulz | 20.11.26 | ○ |
Validation of the successful solution (FMEA, Control Plan, instructions, training)
| Nr. | Action | Responsibility | Deadline | Status |
|---|---|---|---|---|
| 1 | Prozess-FMEA Verpackung überarbeiten: Entdeckungswahrscheinlichkeit durch feste Lehre auf B=2 senken | QMR | 25.11.26 | ○ |
| 2 | Arbeitsanweisung AA-VERP-12 für alle Wicklerlinien (Linie 1–6) standardisieren | Fertigungsleitung | 30.11.26 | ○ |
Transfer to other products/processes (Lessons Learned)
| Nr. | Proposal / activity | Responsibility | Deadline |
|---|---|---|---|
| 1 | Übertragung der festen Einstelllehren auf Linie 1, 2 und 3 bis Q1/2027 | Maintenance | 31.01.27 |
| 2 | Lessons Learned Präsentation im werksweiten KVP-Zirkel | Markus Weber | 05.12.26 |
Justification for non-necessityIdentical winder technology available on 3 other lines.
Completion
The problem-solving case must be presented by the team leader to the steering committee and confirmed by them. This simultaneously serves to relieve the team leader.
Successful A3 completion: edge fracture rate sustainably reduced to 0.00 %. Approval granted by steering committee.
Completed on
18.10.26
Markus Weber
Team leadDr. H. Keller (Plant Management)
Control loop member○ Action with deadline and responsible person◐ Action being implemented● Action implemented● Effectiveness verified