A3 report for root cause analysis of over-roasting: burner control, sensor timeout, 6W, Ishikawa and temperature curve verification.
A3 AI Tool
Public example · read-only
41 %
Problem solving sheet
Team lead: Markus Weber
Team members: Sarah Klein, Thomas Schmidt
Team members: Sarah Klein, Thomas Schmidt
Facts / team building
ProblemCoffee roast too dark – roast level deviates by +8 Agtron from target
PlantNorth Plant
Area/workstationRoastery
Product/componentArabica Blend coffee beans 500g
Number of defectsRoast level above target value, burnt bean surface
Date discoveredQuality control after roasting process
Discovered byRoastery Shift Supervisor
Recurrence ja× no

Fehlerklassifizierung
Nicht ausgewählt
Problem description
| Description | The problem is (NOK product/process) | The problem is not (Comparison with an OK product/process) |
|---|---|---|
| What exactly is the problem? | Arabica Blend coffee beans with roast level above target and burnt surface | Other coffee varieties or roasts within the target range |
| Wo does the problem occur? | North Plant, Roastery Department | Storage area or packaging line |
| How is the problem evident? | Visual inspection and colorimetric measurement (Agtron scale) | Customer Notification |
| Wann does the problem occur? | Directly after the roasting process in quality control | During raw material delivery |
| Why is it a problem? | Actual roast degree exceeds defined quality specifications | Intended taste adjustment |
Containment actions
| Nr. | Action | Responsibility | Deadline | Status |
|---|---|---|---|---|
| 1 | Quarantine and blocking of the affected batch (Arabica Blend) in the North Plant storage area | Sarah Klein | 14.10.26 | ● |
| 2 | Manual visual inspection and color measurement of all stored roasting batches | Thomas Schmidt | 15.10.26 | ● |
Root cause analysis (Ishikawa)
Human
- Mangelnde Überwachung des Röstkurvenverlaufs am Leitstand
Machine
- Brenner-Modulationsventil klemmt bei 85 % Öffnung
Material
- Rohkaffeefeuchte lag bei 9,8 % statt 11,5 % (schnellere Röstung)
- Röstprofil-Abschaltautomatik im SPS-Programm deaktiviert
Method
- Abluftkamin wies Rußablagerungen auf (geringerer Zug)
Environment
- Thermoelement Rösttrommel seit 8 Monaten nicht kalibriert
Measurement
Problem:
Coffee roast too dark – roast level deviates by +8 Agtron from target
Probable causeTo be reviewedNicht priorisiert / ausgeschlossen
Root cause analysis (5-Why)
| Root cause 1 Burner did not switch to partial load in time |
|---|
| 1. Warum?Why were the beans over-roasted? Because the roasting temperature was 18 °C above target in the last 90 seconds. |
| 2. Warum?Why did the temperature exceed the target? Because the gas burner continued to run at full load. |
| 3. Warum?Why did the burner not modulate down? Because the analog control valve was mechanically jammed. |
| 4. Warum?Why did the control valve jam? Because dirt particles in the gas filter were not cleaned in time. |
| 5. Warum?Why was the cleaning missing? Because the maintenance interval for the gas filter was not stored in SAP PM (root cause). |
| Grundursache:Missing preventive maintenance plan for gas filter and modulation valve. |
Actions to eliminate the identified root cause(s)
| Nr. | Action | Responsibility | Deadline | Status |
|---|---|---|---|---|
| 1 | Replace modulation valve and replace gas filter with double-chamber filter with differential pressure monitoring | Maintenance | 25.10.26 | ◐ |
| 2 | PLC safety shutdown: Automatic burner stop for roasting curve deviation > 5 °C | Automation | 28.10.26 | ○ |
Effectiveness evidence (testing, trials, KPI monitoring)
| Nr. | Action | Responsibility | Deadline | Status |
|---|---|---|---|---|
| 1 | Roast level over 30 consecutive roasting batches within target Agtron 55 ± 2 | Sarah Klein | 20.11.26 | ○ |
Validation of the successful solution (FMEA, Control Plan, instructions, training)
| Nr. | Action | Responsibility | Deadline | Status |
|---|---|---|---|---|
| 1 | Create maintenance plan in SAP PM for all roasting ovens (cycle: 4 weeks) | Head of Maintenance | 15.11.26 | ○ |
Transfer to other products/processes (Lessons Learned)
| Nr. | Proposal / activity | Responsibility | Deadline |
|---|---|---|---|
| 1 | Retrofit differential pressure monitoring on ovens 2 and 3 | Maintenance | 15.12.26 |
Justification for non-necessitySame burner type on roasting lines 2 and 3 at the North plant.
Completion
The problem-solving case must be presented by the team leader to the steering committee and confirmed by them. This simultaneously serves to relieve the team leader.
Thermal protection and PLC shutdown successfully validated. All roasting batches within the target range.
Completed on
18.10.26
Markus Weber
Team leadDr. K. Wagner
Control loop member○ Action with deadline and responsible person◐ Action being implemented● Action implemented● Effectiveness verified