Thermal distortion problem in multi-shift operation, 5-Why chain, coolant temperature control as corrective action, Cpk validation.
CAPA / Deviation Management AI Tool
Public example · read-only
PDF & PNG: free for everyone · Other exports: for customers only · JSON: VIPs, Admins and Superadmins only
CAPA-Bericht
Master data & containment
Immediate block of internal finished goods warehouse (1,450 pcs.) and customer consignment warehouse (820 pcs.). 100% eddy current testing and endoscopy set up at inspection station.
Problem description (6W)
| Question | ACTUAL (not OK) | ACTUAL-NOT (OK) |
|---|---|---|
| WHAT | Dimensional deviation of bore diameter +18 µm above upper limit H7 after 4 hours of spindle runtime. | No deviations in the first 90 minutes after shift start. |
| WO | Anlage Montagezelle 3, Spindel 2; festgestellt am Prüfstand Dichtheitsprüfung. | Keine Risse an Zelle 1 und 2; andere Gehäusetypen ohne Auffälligkeiten. |
| WANN | Occurred since 02.09.2026, batch CW34 from tool change T2 to new die-casting cavity. | Batch CW33 (cavity 1) was 100% crack-free. |
| HOW MUCH | 42 non-conforming parts from sample of 350 assembled valves (reject rate 12.0%). | No field failure reported so far, 0 complaints from end customers. |
Root cause analysis (3-way)
Die-casting tool T2 was approved after maintenance with transition radius 1.4 mm instead of the drawing specification of 2.5 mm. Notch stress occurred during pressing.
Leak test bench only responded to through-leaks, not to structural microcracks in the closed material.
Change to cavity T2 was evaluated as regular maintenance and released without re-qualification according to VDA volume 2 / PPAP level 3.
Corrective actions
| Nr. | Type | Action | Resp. | Deadline | Status |
|---|---|---|---|---|---|
| 1 | corrective | Tool correction die casting cavity T2 to R2.8 mm Re-milling and polishing the tool shoulder with guaranteed radii R2.8 mm (+0.3 mm safety allowance for notch stress reduction). | K. Richter (toolmaking) | 12.09.26 | completed |
| 2 | escape_prevention | Integration of eddy current test head at bolting station Retrofitting an automatic eddy current crack test directly in the assembly cycle with automatic part ejection for non-conforming parts. | Mr. Varga (Test Equipment Construction) | 22.09.26 | completed |
| 3 | systemic | SOP adjustment re-qualification for tool maintenance Process directive SOP-QM-042 revised: Every geometry repair on casting molds mandatorily requires EMPB approval of the mold cavity dimensions. | Dr. S. Weber (QMR) | 25.09.26 | completed |
Effectiveness verification
Standardization (FMEA, work instruction, training)
Closure & Approval
The root causes have been completely eliminated technically and systemically. Proof of effectiveness is provided by 0 ppm over 28,400 parts. FMEA, work instruction, and training matrix have been updated.