CAPA-Bericht

CAPA-Nr: CAPA-2026-112
Title: Thermal drifting of the spindle seat during continuous milling (NIO hole H7)
Plant / Org: Vektor Maschinenbau AG
Classification: major · Source: internal_ncr
Problem visual / Failure scenario
No image

Master data & containment

Part / Part numberVMB-SP-500
Batch / LotBatch 44 (85 spindles)
Customer / DepartmentInternal assembly
CAPA-LeiterDr. Stefan Weber (Senior QMR / Resident)
Occurrence date02.09.26
Opening date03.09.26
Ziel-Abschluss15.10.26
KernteamM. Bauer (Process), K. Richter (Design), H. Varga (Production)
Containment action:

Immediate block of internal finished goods warehouse (1,450 pcs.) and customer consignment warehouse (820 pcs.). 100% eddy current testing and endoscopy set up at inspection station.

Blocked: 2,270 units blocked, 0 defective parts at customer assembly lineVerantw.: Hans Varga (Head of Testing Technology)
Status: implemented

Problem description (6W)

QuestionACTUAL (not OK)ACTUAL-NOT (OK)
WHATDimensional deviation of bore diameter +18 µm above upper limit H7 after 4 hours of spindle runtime.No deviations in the first 90 minutes after shift start.
WOAnlage Montagezelle 3, Spindel 2; festgestellt am Prüfstand Dichtheitsprüfung.Keine Risse an Zelle 1 und 2; andere Gehäusetypen ohne Auffälligkeiten.
WANNOccurred since 02.09.2026, batch CW34 from tool change T2 to new die-casting cavity.Batch CW33 (cavity 1) was 100% crack-free.
HOW MUCH42 non-conforming parts from sample of 350 assembled valves (reject rate 12.0%).No field failure reported so far, 0 complaints from end customers.
Why (Hypothesis): Heating of the spindle bearing without active cooling lubricant temperature control.

Root cause analysis (3-way)

Occurrence:

Die-casting tool T2 was approved after maintenance with transition radius 1.4 mm instead of the drawing specification of 2.5 mm. Notch stress occurred during pressing.

Non-detection (Escape):

Leak test bench only responded to through-leaks, not to structural microcracks in the closed material.

Systemic (management/SOP):

Change to cavity T2 was evaluated as regular maintenance and released without re-qualification according to VDA volume 2 / PPAP level 3.

Corrective actions

Nr.TypeActionResp.DeadlineStatus
1correctiveTool correction die casting cavity T2 to R2.8 mm
Re-milling and polishing the tool shoulder with guaranteed radii R2.8 mm (+0.3 mm safety allowance for notch stress reduction).
K. Richter (toolmaking)12.09.26completed
2escape_preventionIntegration of eddy current test head at bolting station
Retrofitting an automatic eddy current crack test directly in the assembly cycle with automatic part ejection for non-conforming parts.
Mr. Varga (Test Equipment Construction)22.09.26completed
3systemicSOP adjustment re-qualification for tool maintenance
Process directive SOP-QM-042 revised: Every geometry repair on casting molds mandatorily requires EMPB approval of the mold cavity dimensions.
Dr. S. Weber (QMR)25.09.26completed

Effectiveness verification

KPI:
Spindle seat diameter Cpk (Target 45H7)
Baseline / Goal:
Cpk = 0,82 (Nicht fähig) → Cpk > 1.67
Actual result:
Cpk = 1,78 (über 120 Folgebearbeitungen) (60 calendar days (10/01/2026 to 11/30/2026))
Judgment:
Effective confirmed · 28.09.26 (Dr. Stefan Weber (QMR))

Standardization (FMEA, work instruction, training)

FMEA updated: Ja (P-FMEA PAS-9821 Rev. 4.2 / Schritt 040 Fügen (Bedeutung B=7, Auftreten A von 6 auf 1 gesenkt, Entdeckung E von 5 auf 2 verbessert).)
Work instruction: Ja (AA-MO-118 Rev. C: 'Wartungsintervall Schraubspindel & Wirbelstromsensor-Kalibrierung'.)
Training: Ja (Schulung von 18 Werkern und 4 Werkzeugmechanikern zu SOP-QM-042 am 26.09.2026 (Teilnehmerliste im LMS hinterlegt).)
Transfer: Transfer of eddy current testing and tool SOP to product series PAS-9840 (Plant 3 Györ).

Closure & Approval

Final judgment:

The root causes have been completely eliminated technically and systemically. Proof of effectiveness is provided by 0 ppm over 28,400 parts. FMEA, work instruction, and training matrix have been updated.

Customer has confirmed 8D-Report and closure on 30.09.2026.
J. Lindner (Plant Manager) & Dr. S. Weber (Head of QM)
Approval (Plant Management) (29.09.26)
Dr. Stefan Weber (Senior QMR / Resident)
QMR
Operational Excellence · Persönlicher KontaktReaktionszeit < 24h

Contact & Consulting

Fragen zu unseren Tools, Schulungen oder einem konkreten Vorhaben? Wir beraten Sie persönlich und praxisnah.