Automotive Tier-1 management review (ISO 9001:2026 & IATF)

Themenportal · ausschließlich ansehen. Keine Anmeldung, Bearbeitung, Speicherung oder KI-Nutzung.

ISO 9001 9.3: Eingaben → Eignungsbewertung → Entscheidungen → Maßnahmen und Wirksamkeitsverfolgung. Fiktive Lernsimulation.

Management Review AI Tool

Public example · read-only

57 %
PortraitDIN A4

PDF & PNG: free for everyone · Other exports: for customers only · JSON: VIPs, Admins and Superadmins only

Management review
Management Review · documented evidence of leadership

Management review 2025 / 2026 according to ISO 9001:2026

Organization
Musterwerk Precision GmbH
Time period
01/01/2025 – 12/31/2025 (outlook 2026)
Review date
2026-09-29
01

Management-Kurzbericht

The first page is intentionally structured like a process description: context, judgment, decisions, and open leadership issues are immediately readable.

Scope
Scope: Development, production, assembly, and distribution of precision components
Organizational unit
Entire company / locations plant 1 & plant 2
Standard basis
ISO 9001 · redaktionelle Kapitelzuordnung; konkrete Normausgabe vor realem Einsatz festlegen
Responsible QM function
Dipl.-Ing. Andreas Kapust (QMR)
Executive Summary / official management decision

Die Geschäftsführung und der Qualitätsmanagement-Beauftragte haben das Managementsystem im Berichtszeitraum 2025/2026 einer umfassenden Bewertung unterzogen. Das System erfüllt alle Anforderungen der neuen ISO 9001:2026 und belegt eine kontinuierliche Verbesserung in allen Kernprozessen. Kundenzufriedenheit, Fehlerreduktion und Qualitätskultur befinden sich auf Höchststand. Die beschlossenen Investitionen in moderne Messtechnik und Personal sichern die Zukunftsfähigkeit ab.

Inputs complete
12/12
QMS-Gesamtwert
4.8/5
Management resolutions
3
Effective confirmed
1/3
02

QMS-Gesamtbewertung

Overall assessment based on suitability, adequacy, effectiveness and strategic alignment.

Eignung
5/5
The QM system fits perfectly with the corporate strategy, innovation pipeline, and changing market conditions.
Adequacy
4/5
Ressourcen und Prozesse sind angemessen und verhältnismäßig; gezielte Personalverstärkung im Qualitätsingenieurwesen ist eingeplant.
Effectiveness
5/5
The intended results are being achieved. Customer satisfaction, complaint rates, and process stability exceed the targets.
Strategic orientation
5/5
Complete alignment with Vision 2030, digitalization roadmap, and climate goals.
Documented management review · Leadership and audit evidenceSIM 1.0
Page 1 / 7
Management review
Framework · Scope · Responsibility

Reporting framework and review basis

Organization
Musterwerk Precision GmbH
Time period
01/01/2025 – 12/31/2025 (outlook 2026)
Review date
2026-09-29
03

Dokumentenkontext

These master data clearly identify who evaluated which area for which period.

Document title
Management review 2025 / 2026 according to ISO 9001:2026
Organization / plant
Musterwerk Precision GmbH
Area / unit
Entire company / locations plant 1 & plant 2
Scope
Scope: Development, production, assembly, and distribution of precision components
Standard basis
ISO 9001 · redaktionelle Kapitelzuordnung; konkrete Normausgabe vor realem Einsatz festlegen
Reporting period
01/01/2025 – 12/31/2025 (outlook 2026)
Review date
2026-09-29
Revision / Status
SIM 1.0
Top management participants
Dr. Klaus Weimann (CEO), Dipl.-Ing. Andreas Kapust (QMR), Thomas Berg (COO), Sabine Frank (CFO), Marcus Wolf (Head of R&D)
04

Governance & Approval

Approval and the next review cycle close the management control loop.

QMR / Approval
Dipl.-Ing. Andreas Kapust (Quality Management Representative / QMR)
Management / Approval
Dr. Klaus Weimann (Chairman of the Management Board / CEO)
Approval date
2026-09-29
Next review date
2027-01-15
Formal statement on suitability / effectiveness
Confirmed: The management system is continually suitable, adequate, and effective.
Documented management review · Leadership and audit evidenceSIM 1.0
Page 2 / 7
Management review
Review inputs · Facts · KPIs · Leadership requirements

Leistungs- und Systembewertung · Teil 1

Organization
Musterwerk Precision GmbH
Time period
01/01/2025 – 12/31/2025 (outlook 2026)
Review date
2026-09-29
05

Rated inputs

Every mandatory input is displayed as a separate documented information block – large enough for management and audit.

9.3.2 a

Maßnahmen früherer Managementbewertungen

positiv
Facts / evidence

9 out of 10 management review decisions for 2025 were implemented on schedule and their effectiveness was verified. One action regarding the CAQ interface was postponed to Q2/2026.

KPI / Measurement signal

Action implementation rate: 90 % (Target: > 85 %)

Managementbedarf

Confirm residual action CAQ interface in the current review with a new deadline.

9.3.2 b

Änderungen bei internen & externen Themen (inkl. Klimawandel)

stable
Facts / evidence

Increase in extreme weather events necessitates buffer stocks for sensitive supplier parts. Cyber-security requirements according to NIS-2 have been formally included in the context analysis.

KPI / Measurement signal

Context analysis currency: 100 % (Review in January 2026)

Managementbedarf

Anchor climate risks in emergency plans and 2nd-source strategy.

9.3.2 c.1

Qualitätspolitik & Erreichung von Qualitätszielen

positiv
Facts / evidence

Unternehmensqualitätsziele für 2025 wurden zu 88 % erreicht. Ziel zur Reklamationsbearbeitungszeit wurde mit 8,4 Tagen (Ziel: <= 10 Tage) übertroffen.

KPI / Measurement signal

Overall degree of goal achievement: 88.2 % (previous year: 82.5 %)

Managementbedarf

New goal 2026: Introduction of a monthly first-pass-yield cockpit in plant 2.

9.3.2 c.2

Prozessleistung & Konformität von Produkten / Dienstleistungen

positiv
Facts / evidence

Gesamtanlageneffektivität (OEE) stieg von 74 % auf 78,5 %. First Pass Yield in der Endmontage liegt stabil bei 98,7 % (Ziel: >= 98,0 %).

KPI / Measurement signal

OEE: 78.5 % | FPY: 98.7 % | Production schedule adherence: 96.2 %

Managementbedarf

Continue setup time optimization on line 3 to reduce batch sizes.

Documented management review · Leadership and audit evidenceSIM 1.0
Page 3 / 7
Management review
Review inputs · Facts · KPIs · Leadership requirements

Leistungs- und Systembewertung · Teil 2

Organization
Musterwerk Precision GmbH
Time period
01/01/2025 – 12/31/2025 (outlook 2026)
Review date
2026-09-29
06

Rated inputs

Every mandatory input is displayed as a separate documented information block – large enough for management and audit.

9.3.2 c.3

Nichtkonformitäten, Reklamationen & Korrekturmaßnahmen

positiv
Facts / evidence

Customer complaints decreased by 18 % compared to the previous year (42 cases in 2025 vs. 51 cases in 2024). Repeat error rate decreased from 8 % to 2.4 %.

KPI / Measurement signal

Complaint rate: 0.38% (target: < 0.50%) | 8D completion rate in 30 days: 92%

Managementbedarf

Audit suppliers for turned parts in case of two recurring dimensional deviations.

9.3.2 c.4

Ergebnisse von Überwachungen und Messungen

positiv
Facts / evidence

100 % of all 420 registered inspection equipment are currently calibrated and managed in the digital inspection equipment register. MSA measurement system analyses for critical characteristics have been renewed.

KPI / Measurement signal

Gauge availability: 99.8 % | Overdue inspections: 0

Managementbedarf

Prepare transition to optical 3D coordinate measurement for plant 1.

9.3.2 c.5

Auditergebnisse (Interne Audits, Kundenaudits, Zertifizierung)

positiv
Facts / evidence

Annual audit program 2025 100% completed (6 system & 8 process audits). Zero major non-conformities, 3 minor non-conformities (already closed), 6 potential improvements.

KPI / Measurement signal

Audit plan completion: 100% | Overdue audit CAPAs: 0

Managementbedarf

Increase focus of 2026 internal audits on quality culture and data integrity.

9.3.2 c.6

Leistung externer Anbieter / Lieferantenbewertung

stable
Facts / evidence

86 % of A-suppliers are in the green zone. A plastic injection molder experienced supply bottlenecks in Q3, which were bridged by emergency quotas.

KPI / Measurement signal

Supplier delivery reliability: 94.1% | Incoming goods complaint rate: 1.2%

Managementbedarf

Schedule supplier development meetings with 2 B suppliers in Q1/2026.

Documented management review · Leadership and audit evidenceSIM 1.0
Page 4 / 7
Management review
Review inputs · Facts · KPIs · Leadership requirements

Leistungs- und Systembewertung · Teil 3

Organization
Musterwerk Precision GmbH
Time period
01/01/2025 – 12/31/2025 (outlook 2026)
Review date
2026-09-29
07

Rated inputs

Every mandatory input is displayed as a separate documented information block – large enough for management and audit.

9.3.2 d

Angemessenheit von Ressourcen

stable
Facts / evidence

2025 training plan was 91% implemented. Skilled labor shortage in CNC machining was mitigated through increased internal upskilling and automation.

KPI / Measurement signal

Training hours per employee: 24.5 h/year | Employee turnover: 4.1%

Managementbedarf

Approve additional position for junior quality engineer for plant 2.

9.3.2 e

Wirksamkeit von Maßnahmen zu Risiken & Chancen

positiv
Facts / evidence

All 14 gross risks in the risk register have been reduced to net values below the risk appetite through actions. Two quick-win opportunities yielded €320,000 in contribution margin growth.

KPI / Measurement signal

Critical residual risks (> 10): 0 | Realized opportunities: 2 of 3 projects

Managementbedarf

Make biannual re-assessment of risks and opportunities mandatory in the management calendar.

9.3.2 e/f

Qualitätskultur, Mitarbeiterbewusstsein & Datenintegrität (Neu 2026)

positiv
Facts / evidence

Introduction of the 'Quality Culture & Transparency' mission statement. 100% of managers have been trained. No incidents of data manipulation or inspection report inconsistencies.

KPI / Measurement signal

Employee feedback index on error culture: 8.2 / 10 | Reported near-misses: +45 % (positive)

Managementbedarf

Establish regular lessons-learned rounds in all shift teams.

9.3.2 f

Chancen zur kontinuierlichen Verbesserung (KVP)

positiv
Facts / evidence

64 ideas were submitted in the employee suggestion system, 41 of which were implemented. Total savings: approx. € 185,000 in the current year.

KPI / Measurement signal

Realized KVP ideas: 41 | Net economic benefit: 185,000 €

Managementbedarf

Revise 2026 KVP reward model and enable digital submission via app.

Documented management review · Leadership and audit evidenceSIM 1.0
Page 5 / 7
Management review
Outputs · Decisions · Resources

Top management resolutions

Organization
Musterwerk Precision GmbH
Time period
01/01/2025 – 12/31/2025 (outlook 2026)
Review date
2026-09-29
08

Managemententscheidungen

Do not just report: The Management Review must generate visible decisions.

BES-2026-01
improvement
Investment in optical 3D coordinate measurement
Approval of an investment budget of €85,000 for an automated inline optical measuring cell in Plant 1 for scrap prevention.
Owner
Thomas Berg (COO) & QMR
Deadline
2026-06-30
Budget / resource
85.000 €
Status
approved
Expected effect: Reduction of testing time by 50%, zero-defect security for customer order X-Line.
BES-2026-02
system_change
Transition to ISO 9001:2026 & separation of risks/opportunities
Revision of the QM manual and process descriptions for the 2026 standard revision including anchoring of the opportunity portfolio.
Owner
Dipl.-Ing. Andreas Kapust (QMR)
Deadline
2026-05-15
Budget / resource
€12,000 (training & consulting)
Status
in_progress
Expected effect: Full conformity for the upcoming re-certification audit in autumn 2026.
BES-2026-03
resources
Create an additional position for quality engineering
Job posting for a full-time position to support APQP and FMEA moderation.
Owner
Sabine Frank (CFO / HR)
Deadline
2026-04-01
Budget / resource
78.000 € p.a.
Status
approved
Expected effect: Relief for the project team and faster serial releases.
Documented management review · Leadership and audit evidenceSIM 1.0
Page 6 / 7
Management review
Actions · Responsibility · Effectiveness evaluation

Implementation and evidence of effectiveness

Organization
Musterwerk Precision GmbH
Time period
01/01/2025 – 12/31/2025 (outlook 2026)
Review date
2026-09-29
09

Action control

Every action connects the need for action with responsibility, deadline, verification method, and actual evidence of effectiveness.

M-2026-01 · Bezug Supplier performance

Supplier audit and 2nd source qualification for turned parts

in_progress

Execution of a process audit according to VDA 6.3 at supplier L-108 and parallel initial sample inspection at alternative supplier.

Owner / Due date
M. Schmidt (Purchasing) / QMR · 2026-04-30
Effectiveness KPI
Failure rate turned parts < 0.1 % over 90 days after start of production
Inspection method
Review audit report and approve First Article Inspection Report (FAIR Level 3)
Verified
— · —
M-2026-02 · Bezug Context & climate change

Emergency power and climate resilience inspection for server room & test laboratory

open

Retrofitting a redundant air conditioning system and stress testing the UPS systems for extreme heat days.

Owner / Due date
Facility Management · 2026-05-31
Effectiveness KPI
Room temperature stable < 22°C at outside temperature > 35°C
Inspection method
Load test report and climate control system acceptance report
Verified
— · —
M-2026-03 · Bezug Quality culture & employees

Rollout 'Culture of Quality' shift dialogues

verified

Introduction of 15-minute weekly quality impulses in all production shifts.

Owner / Due date
Production Manager / Shift Supervisor · 2026-03-31
Effectiveness KPI
Participation rate > 95% and 20+ reported improvements
Inspection method
Participant lists and random audit in the early shift
Verified
2026-03-28 · QMR
Documented management review · Leadership and audit evidenceSIM 1.0
Page 7 / 7
Management review
Completion · Management Statement · Follow-up

Approval and management summary

Organization
Musterwerk Precision GmbH
Time period
01/01/2025 – 12/31/2025 (outlook 2026)
Review date
2026-09-29
10

Abschlussbewertung

The final page is the readable conclusion of the review report and serves as management and audit evidence.

Gesamtfazit

Top management hereby officially confirms the continuing suitability, adequacy, and effectiveness of the quality management system according to ISO 9001:2026.

Statement of conformity/suitability
Confirmed: The management system is continually suitable, adequate, and effective.
Next review
2027-01-15
Quality Management / QMR
Dipl.-Ing. Andreas Kapust (Quality Management Representative / QMR)
Top management
Dr. Klaus Weimann (Chairman of the Management Board / CEO)
Review-Regelkreis

Inputs rated → overall judgment documented → management decisions made → actions with responsibility and deadline set → effectiveness verified → next review date defined.

Documented management review · Leadership and audit evidenceSIM 1.0
Page 8 / 7
Operational Excellence · Persönlicher KontaktReaktionszeit < 24h

Contact & Consulting

Fragen zu unseren Tools, Schulungen oder einem konkreten Vorhaben? Wir beraten Sie persönlich und praxisnah.