Replacement of random manual microscopy with high-resolution AI cameras with automatic pass/fail sorting.
Opportunity Portfolio AI Tool
Public example · read-only
Multi-page A4 landscape format: management overview, dossiers, QMS integration, effectiveness, and learning page.
PDF & PNG: free for everyone · Other exports: for customers only · JSON: VIPs, Admins and Superadmins only
Management A3 · Opportunities at a glance
Silizium Präzisions-Elektronik AG
Fully automated inspection stations before packaging & shipping · 2026 – 2028
Sheet 1 / 5
Quick Wins
High benefit with low effort – immediate priority and implementation.
Strategic breakthroughs
Very high potential benefit, but requires significant investment & time.
Niche / filler projects
Low benefit, but very low implementation effort.
Resource drain / Defer
Low benefit with high effort – economically unprofitable.
Chancen-Dossiers · Evidenz → Bewertung → Entscheidung 1
Silizium Präzisions-Elektronik AG
Fully automated inspection stations before packaging & shipping · 2026 – 2028
Sheet 2 / 5
—
Ausgangslage: —
Priority 1: Immediate budget approval and agile implementation.
—
—
Ausgangslage: —
Priority 2: Inclusion in strategic roadmap and business case review.
—
Umsetzungs- & QMS-Integrationsplan 1
Silizium Präzisions-Elektronik AG
Fully automated inspection stations before packaging & shipping · 2026 – 2028
Sheet 3 / 5
| Opportunity / decision | Action / Experiment | Owner / Due date | QMS-Prozess | Document / System | Concrete integration change | Business Case |
|---|---|---|---|---|---|---|
| OPP-IND-01 AI-based real-time detection of micro-cracks on lead frames — | Final acceptance of the first inspection line and operator training on annotation of new defect patterns. | M. Krause (Head of Automation) 2026-10-31 | — | — | — | 480% in the first year |
| OPP-IND-02 Automated feedback of measurement data into tool correction parameters — | Execution of a 4-week endurance test on stamping line 3. | B. Wollner (Tooling) 2026-11-30 | — | — | — | 290% over 2 years |
Process named
Document/system named
Change described
“Show me, using a tracked opportunity, what has actually changed in the QMS.” The answer must consist of process, document/system, revision/change, and responsibility – not just the project name.
Closed Loop · Wirksamkeit & Lernen 1
Silizium Präzisions-Elektronik AG
Fully automated inspection stations before packaging & shipping · 2026 – 2028
Sheet 4 / 5
| Opportunity | KPI / measurement method | Baseline | Objective | Actual | Review | Effectiveness | Lessons Learned / next PDCA step |
|---|---|---|---|---|---|---|---|
| OPP-IND-01 AI-based real-time detection of micro-cracks on lead frames | Detection accuracy > 99.98% at 0% pseudo-scrap (false positives < 0.1%) | — | — | — | 2026-09-09 | ○ open | — |
| OPP-IND-02 Automated feedback of measurement data into tool correction parameters | Cpk value constant > 1.67 over the entire tool life | — | — | — | 2026-09-09 | ○ open | — |
A statement like "successfully implemented" is not enough. Evidence consists of: Baseline + target value + actual value + measurement date + conclusion.
A cleanly documented "not effective" is not a system error, but evidence of effective learning. This leads to a new PDCA step.
How to read the opportunity portfolio · Learning & audit page
Silizium Präzisions-Elektronik AG
Fully automated inspection stations before packaging & shipping · 2026 – 2028
Sheet 5 / 5
What should be improved? Scope and horizon.
Which concrete signal indicates an opportunity?
What do we know – and what is merely an assumption?
Which desired effect is created for whom?
What is the true cost – incl. dependencies?
Pursue, Pilot, Defer or Decline – why?
Which process / document is changing?
Baseline → Target → Actual → Conclusion.
What remains, what is adapted, what is terminated?
When is the portfolio reprioritized?
shows benefit × effort. It is a visual filter, not an automatic approval.
consolidates benefit 35%, strategic fit 25%, confidence 15% and feasibility 25%. It serves only for comparability; missing evidence must remain visible.
evaluates the robustness of the assumptions – not the probability of success.
are valid results. A portfolio in which everything is implemented shows no real rating.
- 1. How was the opportunity determined?
Signal, source, date and affected process are traceable. - 2. How was it analyzed and rated?
Evidence, baseline, benefit, effort, fit and uncertainty are visible separately. - 3. How was the action integrated?
Process, document/system, change, owner and deadline form the implementation trail. - 4. Did the action work?
Baseline, target, actual value, measurement date and Lessons Learned close the loop.